Photo Gallery of St Mark's Refurbishment

The concrete plinth under the raised sanctuary floor is now removed. 

The steel for the widened acoustic partition is now in place

  • The windows and doors (front door excepted) have been replaced 

  • and the electric wiring is part complete

  • The new stud walls in the entrance hall, toilets and cupboards are in place.

  • A new flooring with damp proof is now in place.

These were taken on Friday 19th March ...